Loch Ard Bridge

  • Replacing an overwhelmed 2.5m diameter steel culvert from a flash flood in Loch Ard Forest near Aberfoyle for FLS.
  • Replaced with a 9.5m single span bridge.
  • 4m high, precast concrete abutments built using Legato concrete blocks.
  • Galvanized steel beams and steel cross bracing supporting a timber deck and side rails.
  • Road bridge access required for HGVs transporting construction plant machinery and for extracting timber.
Loch Ard Bridge 3
Scroll to Top