Bracklinn Falls Footbridge

  • Replacement footbridge at the Bracklinn Falls. 
  • No road or vehicular access to the bridge site. Access for construction of the footbridge was along a 1.5km long footpath.
  • Scope of works (designed by Cake Industries) to install temporary works to enable the construction and installation of a single span, 24m long corten steel footbridge.
  • Temporary works involved installation of a pair of RHS steel beams with cross bracing and an overhead cable crane. 
  • Using the temporary works the footbridge was launched from the West across the steep gorge and landed onto the East abutment. 
  • 6-week duration project.
Bracklinn Falls 1