North Esk Reservoir
- Project scope to replace a condemned timber bridge used to access the valve tower controlling the water levels in the North Esk Reservoir, above Carlops.
- Difficult access and stringent environmental restrictions in a SSSI site.
- Replacement 24m aluminum truss walkway was selected for its light weight and ease of installation.
- New bridge to connect vertically to the existing 200 year old valve tower and onto a new concrete base in the reservoir embankment.
